Thumbnail
Access Restriction
Open

Author Watson, Jeanine S. ♦ Bose, Kimberly D.
Source CiteSeerX
Content type Text
File Format PDF
Subject Domain (in DDC) Computer science, information & general works ♦ Data processing & computer science
Subject Keyword Via Electronic Filing ♦ Pjm Tariff ♦ Interruptible Load ♦ Attachment Dd ♦ Obsolete Reference ♦ Enclosed Revision ♦ Docket No ♦ Active Load Management ♦ Pjm Open Access Transmission Tariff ♦ Etariff Section ♦ Reliability Assurance Agreement ♦ Attachment Appendix ♦ Parallel Provision ♦ Pjm Region ♦ Pjm Stakeholder ♦ Et Al
Abstract the parallel provisions of Attachment K – Appendix of the PJM Open Access Transmission Tariff (“PJM Tariff”), 1 and the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region (“RAA”) to remove obsolete references to PJM’s past Interruptible Load for Reliability (“ILR”) and Active Load Management (“ALM”) programs. The enclosed revisions were overwhelmingly endorsed by PJM stakeholders, and are submitted in accordance with the Commission’s March 26, 2009 order in Docket Nos. ER05-1410-000 et al. 2 and the Commission’s September 14, 2009 order in Docket No. ER09-701-000,-001. 3 PJM also includes a revision to Section 5.11 of Attachment DD of the PJM Tariff that the Commission previously accepted in Docket No. ER13-149-000 but which, by error, PJM re-inserted in the eTariff sections filed on December 7, 2012 in Docket No. ER13-535-000. 1
Educational Role Student ♦ Teacher
Age Range above 22 year
Educational Use Research
Education Level UG and PG ♦ Career/Technical Study
Publisher Date 2013-01-01