Thumbnail
Access Restriction
Open

Source CiteSeerX
Content type Text
File Format PDF
Subject Domain (in DDC) Computer science, information & general works ♦ Data processing & computer science
Subject Keyword Fuzzy Environment ♦ Total Penalty Cost ♦ Single Machine ♦ Developed Heuristic Algorithm Performs ♦ Total Tardiness Cost ♦ Distinct Due Date ♦ Machine Problem ♦ Time Manufacturing ♦ Total Earliness ♦ Small System
Abstract Abstract: Single machine, distinct due dates, early/lately machine problem and fuzzy environment closely models the situation faced by ‘Just In Time ’ manufacturing. The objective of this paper is to sequence the jobs on the machine, so that the total penalty cost be minimum. This cost is composed of the total earliness and the total tardiness cost. An algorithm is developed here to minimize the total penalty cost due to earliness or lateness of jobs in fuzzy environment. Result shows that the developed heuristic algorithm performs well with small system.
Educational Role Student ♦ Teacher
Age Range above 22 year
Educational Use Research
Education Level UG and PG ♦ Career/Technical Study
Learning Resource Type Article